1. The Main Participators 2. Sources of Finance 3. Valuations and Development Appraisal 4. Introduction to Design Economics 5. Approximate Estimating 6. Whole Life Costing (WLC) and Life Cycle Analysis (LCA) 7. Value Management or Engineering 8. Procurement Methods and Types of Contract 9. Standard Method of Measurement and Bills of Quantities 10. Estimating and Tendering Procedures 11. Bidding Strategy 12. Purchasing 13. Post Control Cost Control 14. Interim Valuations, Claims and Variations 15. Post Contract Cost Systems
Biography
Chris March is a graduate from the University of Manchester. He worked for John Laing Construction and later for John Laing Concrete where he became Factory Manager. On entering higher education he worked in both the UK and Hong Kong before joining the University of Salford becoming Senior Lecturer and then the Dean of the Faculty of the Environment. He is a former winner of the Council for Higher Education Construction Industry Partnership Award for Innovation.