    This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.

    SECTION I PLANNING AND EXECUTION IN LEVEL 3

    1 Management, Control and Administration

    2 HSE, Social and Security

    3 Services and Facilities to Owner

    4 Engineering

    5 Procurement and Supply

    6 Transport, Logistic and Storage

    7 Construction

    8 Pre-Commissioning

    9 Commissioning, Start-up and Performance Test

    10 Temporary Facilities

    SECTION II COMMERCIAL ASPECTS

    11 Commencement Date and Effective Dates

    12 Extension of Time

    13 Professionally Handling Large Claims

    14 Prolongation and Disruption Costs

    15 Penalty/Interest for Payment Delays

    16 Force Majeure

    17 Concurrent Delays

    18 Hedging against Currency Fluctuations

    19 Indemnity

    20 Consequential, Indirect Damages

    21 Laws and Regulations

    22 Escalation

    23 Liens

    24 Total Liability

    25 Payment Terms

    26 Planning

    27 Progress Measurement

    28 EOT claim

    29 Interpretation Rules

    30 Change/Variations/Trend Notices

    31 Contract Price below Floor Price and Consequences

    32 Owner’s Delay on Document Approval

    33 Insurances

    SECTION III TECHNICAL ASPECTS

    34 Life Cycle Cost Analysis (LCCA)

    35 Consequences of Delayed Rigless Test on Wells (Owner Delays)

    36 Strategy for using Non-Spec Feedstock for Commissioning

    37 Gas In and Authority Check points

    38 Value Engineering

    39 Design Defect, Construction Defect and Damages

    40 NDT (Non-Destructive Testing)

    41 Destructive Testing

    42 Hydrostatic Leak Test

    43 Heavy Lift Load Sharing for Cranes

    SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING

    APPENDIX

    1. Project Organization
    2. Contract Price Weight Factor
    3. Monthly Status Report Contents
    4. Material Requisition Cycle(MR)
    5. FEED Deliverable List
    6. Process Block Flow Diagram
    7. Document Categories
    8. Claims and Liens Release Letter
    9. Prolongation and Disruption Cost: Hudson formula
    10. A typical list of Procedures and Plans

    Total Plant Break down into Areas

    Biography

    Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..